CHALLENGE
In 2006, we secured the contract for Germany’s first major railway project in China—the dual-direction high-speed rail from Wuhan to Guangzhou. As the exclusive sleeper mould manufacturer for the Wuhan-Guangzhou line, we manufactured nearly 700 sets of sleeper molds between 2007 and 2008.
SOLUTION
Our moulds not only met the stringent standards set by the European quality inspection team, but also continue to be in use today, showcasing their lasting quality and reliability.
DISTANCE
1069 km
DESIGNED SPEED
394km/h
SLEEPER MOULDS
700 sets
Railroad construction machinery
Over de duration of the project, we were asked to develop multiple construction machinery to improve track laying quality, efficiency and overall labour intensity.